The work mobilization area will be located between the intersection of Marc-Cantin St. and Gaétan-Laberge blvd., to the east, and the intersection of Pierre-Dupuy Av. and Bonaventure Expy., to the west.
Specific mitigation measures will be implemented:
Air, water and soil quality (management of demolition and excavation waste generated by the development work, treatment of water collected during the work, sediment control barrier, etc.).
Noise and vibrations (use of silencers, positioning of temporary noise barriers, dust measuring devices and sound level meters placed at the site and near homes, noise control program, monitoring of compliance with work schedules, etc.).
Truck traffic at the site will be controlled by the proper signage, and flaggers will also direct this traffic as necessary.