Reports and studies

All structures are inspected and assessed accordingly on an annual basis.

These inspections guide the Corporation’s programs and prioritize work in the coming years.

Deconstruction of the original Champlain Bridge

Solution Bonaventure

Other important reports

Champlain Bridge
Feasibility study on the deconstruction of the existing Champlain Bridge (2016-2017)
Jacques-Cartier Bridge
Jacques Cartier Bridge Multipurpose Path winter-maintenance pilot project reports
Sustainable development

Please note that these reports were redacted in accordance with Section 25 of the Access to Information Act (AIA), which means that some (but relatively little) information in these documents has been hidden in accordance with the AIA. The following is a list of sections of the AIA under which this information cannot be given: 16 (2), 18 a), b) and d), 19 (1), 20 (1) a), b), c) and d), and 21 (1) a), b) and c).

Go to top