Work on the river | Deconstruction of the third span over the river on a catamaran barge from August 8 to 12 | PJCCI
Work on the river | Deconstruction of the third span over the river on a catamaran barge from August 8 to 12
August 6, 2021 Champlain Deconstruction

The deconstruction of the third span will be carried out on the river on the catamaran barge, near the shore on the Île des Soeurs sector, from Sunday, August 8 to Thursday, August 12, between 7 a.m. to 7 p.m.
 

  • This complex and sensitive work will be postponed in the event of unfavorable weather conditions.
  • Continuous noise monitoring will be conducted during the work. No exceedance of the noise criteria is anticipated.
  • Mitigation measures put in place: sound-level meter; spraying at the source and installation of dust shields to suppress dust; and water quality monitoring.
Any questions?
Contact us Subscribe to alerts