MAJOR BLITZ WORK – Complete closure of several portions of the Bonaventure Expy., in both directions, from October 30 to November 2
October 28, 2020
Bonaventure sector
Update : October 31, 2020
WORK COMPLETED
- From Friday, October 30, 9:30 p.m. to
Monday, November 2, 5 a.m.:
- Complete closure of the Bonaventure Expy., toward Samuel De Champlain Bridge, from Wellington Street.
- From Friday, October 30, 10 p.m., to Saturday, October 31, 5 a.m.:
- Complete closure of the Bonaventure Expressway, toward downtown, at Exit 2.
- For worksite dismantling operations.
- Consult the detours.