Bonaventure Expy. | Work in the Bonaventure Expressway sector: March to December 2025
March 7, 2025 Bonaventure sector

The Jacques Cartier and Champlain Bridges Incorporated would like to advise the public that work involving major hindrances will take place in the Bonaventure Expressway sector between March and December 2025.

 

Elevated lanes sector (between Wellington St. and Victoria Bridge):

As of March 10, until December 2025

  • 2 out of 3 lanes per direction open at all times
  • Work to repair the slab and replace deck joints

 

Clément Bridge sector and its approaches (between Bonaventure Expy. and Hwy-15):

As of March 24, until December 2025

  • 1 out of 2 lanes per direction open at all times
  • Rehabilitation of the abutments on the Clément Bridge, planing and paving work and repairs to concrete surfaces

 

 

Subscribe to our X account @SecBonaventure to be informed in real time.

 

For information about the Louis-Hippolyte-La Fontaine Tunnel, the Samuel De Champlain Bridge, or any other structures managed by our mobility partners, visit our web page.

Any questions?
Contact us TO SUBSCRIBE
Consult the Live Traffic

Plan your travel.

 • In-progress road closures or
    obstructions
 • Cameras
 • 14-day work schedule

Go to top