Bonaventure Expy. | Complete night closure of the Gaétan-Laberge Blvd., toward downtown, on November 6 and partial lane closure until November 18
November 4, 2022
Bonaventure sector
From Sunday, November 6, 9 p.m., to Monday, November 7, 5 a.m.:
- Complete closure of the Gaétan-Laberge Blvd., toward downtown, from Exit 60 of the Hwy. 15 North.
From Monday, November 7 to Friday, November 18:
- Closure of one lane out of two on the Gaétan-Laberge Blvd. and on the Bonaventure Expy., at Clement Bridge, toward downtown.
- For signage and drilling work.