Bonaventure Expy. | Closure of two right lanes, toward Samuel De Champlain Bridge, on December 6
December 3, 2020
Bonaventure sector
- On Sunday, December 6, from 5 a.m. to 8 p.m.
- Closure of two right lanes of the Bonaventure Expressway, toward Samuel De Champlain Bridge, between Victoria Bridge and Gaetan Laberge blvd.
- Drilling work.