Melocheville Tunnel Sidewalk
Open for the regular season

In addition to the colored dots, subscribe to work alerts or follow us on the X account to find out the status of JCCBI’s active mobility paths and sidewalks.

No hindrance in progress

Planned hindrances

Wed
10 Sep
Thu
11 Sep
Fri
12 Sep
Sat
13 Sep
Sun
14 Sep
Mon
15 Sep
Tue
16 Sep
Wed
17 Sep
Thu
18 Sep
Fri
19 Sep
Sat
20 Sep
Sun
21 Sep
Mon
22 Sep
Tue
23 Sep

Work advisories

Estacade | Permanent closure of the access to the Estacade bicycle path rest area from September 18
Jacques Cartier Bridge | Complete night closure of a portion of the multipurpose path on September 10 and 11
Estacade | Phase changing for the limited access to the St. Lawrence Seaway dike bicycle path, from Augut 4…
1 / 1
Melocheville Tunnel Sidewalk

Melocheville Tunnel Sidewalk

Located near the Beauharnois generating station, the Melocheville Tunnel passes directly under the St. Lawrence Seaway to maintain a constant flow of vehicles—and pedestrians! In fact, the tunnel has a dedicated sidewalk that lets you safely walk the 1.4 km under the river.

Schedule

Summer season schedule: open 24 hours a day, 7 days a week*.
 

*JCCBI would like to remind you that throughout the summer season, occasional closures will be necessary in order to perform some maintenance work and that it is essential to respect the closure notices for safety reasons.
 


 

Winter season schedule: closed*
 

* The start date of the winter season schedule is set by the City of Beauharnois. 

 


 

At all times, JCCBI invites pedestrians and cyclists to be cautious and courteous on the paths and follow all safety instructions.

 

Get the latest information about JCCBI’s bicycle and pedestrian network: 

     • Consult the Active Mobility work advisories
     • Follow us on X @mobiliteactive
     • Subscribe to our Active Mobility email alert

 

Have a good trip and stay safe!

Schedule
Go to top