Bonaventure Expy. | Closure of several lanes, in both directions, from September 18 to 20
September 17, 2021
Bonaventure sector
From Saturday, September 18, 8 a.m., to Monday, September 20, 5 a.m.:
- Closure of two lanes, between Wellington Street and Victoria Bridge. One lane available for driving, toward Samuel De Champlain Bridge.
- Closure of two lanes, between Victoria Bridge and Wellington Street. One lane available for driving, toward downtown.
From Sunday, September 19, 8 p.m., to Monday, September 20, 5 a.m.:
- Closure of the Exit 2, toward Samuel De Champlain Bridge, and of a portion of Riverside Street.
For structural work.