fbpx

New configuration of the Bonaventure Expy. in both directions starting on September 10

9 September 2020

Long-term closure (approximately two months) of two (2) right-hand lanes of the Bonaventure Expy. toward downtown starting on September 10 at 5 a.m.

  • To carry out structural work
  • New morning peak configuration in both directions (See the map)
  • New evening peak configuration in both directions (See the map)