fbpx

Île des Soeurs sector | Excavation work on the jetty on March 27 and 28 between 7 a.m. and 7 p.m.

24 March 2021

  • Saturday, March 27 and Sunday, March 28 between 7 a.m. to 7 p.m.
  • Excavation work with transport of material from the Ile des Soeurs jetty to Gaétan-Laberge Blvd.
  • No exceeding of the sound criteria is anticipated