fbpx

The Champlain Bridge contains 250,000 tonnes of concrete, 25,000 tonnes of steel and 12,000 tonnes of asphalt that can be reused. JCCBI is therefore launching an ambitious progra, to maximize the reuse of steel from the Champlain Bridge for different projects:

  • Art;

  • Recreational Tourism;

  • Cultural;

  • Infrastructure.

As priority of this program will be the reuse and possible recycling of materials at local sites. JCCBI will use a traceability system to carefully track the materials throughout the disposal process.